PPM for Tuesday 07 April
Key info
Public Performance Measure (PPM) is the older measure of train operator performance. PPM is based only on delay at destination and the train must have called at all planned stops.
Source: Network Rail
Data quality: Low – Data source does not adjust for calling pattern changes and some smaller methodology differences
Last updated: 7 April 2026 at 23:53
National summary
Within PPM: 19304 (88%)
Late: 1708 (8%)
Very late or cancelled: 721 (3%)
Total: 21733
Train Operating Company (TOC) summary
| Operator name | Within PPM | Late | Very late or cancelled |
|---|---|---|---|
| Elizabeth line | 997 (97%) | 24 (2%) | 6 (1%) |
| Greater Anglia | 1200 (95%) | 49 (4%) | 3 (0%) |
| London Overground | 1457 (94%) | 22 (1%) | 62 (4%) |
| Govia Thameslink Railway | 2991 (91%) | 186 (6%) | 99 (3%) |
| ScotRail | 2015 (91%) | 143 (6%) | 49 (2%) |
| Merseyrail | 546 (90%) | 31 (5%) | 28 (5%) |
| Southeastern | 1579 (90%) | 129 (7%) | 39 (2%) |
| London North Eastern Railway | 170 (89%) | 17 (9%) | 2 (1%) |
| West Midlands Trains | 958 (87%) | 85 (8%) | 46 (4%) |
| Great Western Railway | 1419 (86%) | 178 (11%) | 53 (3%) |
| TransPennine Trains | 255 (86%) | 28 (9%) | 13 (4%) |
| Avanti West Coast | 134 (86%) | 14 (9%) | 7 (5%) |
| Northern Trains | 2284 (85%) | 319 (12%) | 58 (2%) |
| Chiltern | 229 (83%) | 40 (15%) | 6 (2%) |
| South Western Railway | 1345 (83%) | 196 (12%) | 62 (4%) |
| c2c | 284 (80%) | 50 (14%) | 19 (5%) |
| CrossCountry | 210 (79%) | 39 (15%) | 15 (6%) |
| East Midlands Railway | 394 (79%) | 88 (18%) | 13 (3%) |
| Transport for Wales | 836 (79%) | 70 (7%) | 141 (13%) |
| Caledonian Sleeper Limited | 1 (-1%) | 0 (0%) | 0 (0%) |
Open Access Operator summary
| Operator name | Within PPM | Late | Very late or cancelled |
|---|---|---|---|
| Heathrow Express | 144 (97%) | 4 (3%) | 0 (0%) |
| Lumo | 9 (90%) | 1 (10%) | 0 (0%) |
| Hull Trains | 12 (85%) | 2 (14%) | 0 (0%) |
| Grand Central | 16 (80%) | 4 (20%) | 0 (0%) |