PPM for Thursday 03 April
Key info
Public Performance Measure (PPM) is the older measure of train operator performance. PPM is based only on delay at destination and the train must have called at all planned stops.
Source: Network Rail
Data quality: Low – Data source does not adjust for calling pattern changes and some smaller methodology differences
Last updated: 3 April 2025 at 19:20
National summary
Within PPM: 13825 (87%)
Late: 1326 (8%)
Very late or cancelled: 621 (4%)
Total: 15772
Train Operating Company (TOC) summary
Operator name | Within PPM | Late | Very late or cancelled |
---|---|---|---|
Greater Anglia | 918 (97%) | 19 (2%) | 8 (1%) |
Chiltern | 247 (96%) | 10 (4%) | 0 (0%) |
London Overground | 1088 (95%) | 34 (3%) | 20 (2%) |
ScotRail | 1563 (94%) | 75 (5%) | 21 (1%) |
East Midlands Railway | 338 (93%) | 14 (4%) | 9 (2%) |
Elizabeth line | 483 (93%) | 27 (5%) | 5 (1%) |
Transport for Wales | 684 (89%) | 43 (6%) | 36 (5%) |
Southeastern | 1133 (88%) | 138 (11%) | 14 (1%) |
CrossCountry | 160 (88%) | 11 (6%) | 10 (6%) |
TransPennine Trains | 202 (88%) | 20 (9%) | 5 (2%) |
Northern Trains | 1711 (87%) | 196 (10%) | 57 (3%) |
South Western Railway | 1005 (86%) | 120 (10%) | 42 (4%) |
Great Western Railway | 1062 (85%) | 106 (9%) | 68 (6%) |
London North Eastern Railway | 105 (84%) | 14 (11%) | 6 (5%) |
Govia Thameslink Railway | 1708 (83%) | 221 (11%) | 116 (6%) |
West Midlands Trains | 756 (82%) | 100 (11%) | 65 (7%) |
Merseyrail | 395 (79%) | 66 (13%) | 36 (7%) |
c2c | 168 (59%) | 45 (16%) | 70 (25%) |
Avanti West Coast | 99 (49%) | 67 (34%) | 33 (17%) |
Open Access Operator summary
Operator name | Within PPM | Late | Very late or cancelled |
---|---|---|---|
Lumo | 7 (100%) | 0 (0%) | 0 (0%) |
Heathrow Express | 103 (91%) | 10 (9%) | 0 (0%) |
Grand Central | 9 (64%) | 4 (29%) | 1 (7%) |
Hull Trains | 5 (55%) | 0 (0%) | 4 (44%) |