PPM for Sunday 18 May
Key info
Public Performance Measure (PPM) is the older measure of train operator performance. PPM is based only on delay at destination and the train must have called at all planned stops.
Source: Network Rail
Data quality: Low – Data source does not adjust for calling pattern changes and some smaller methodology differences
Last updated: 18 May 2025 at 20:19
National summary
Within PPM: 8340 (88%)
Late: 620 (7%)
Very late or cancelled: 462 (5%)
Total: 9422
Train Operating Company (TOC) summary
Operator name | Within PPM | Late | Very late or cancelled |
---|---|---|---|
c2c | 153 (98%) | 3 (2%) | 0 (0%) |
Greater Anglia | 663 (98%) | 5 (1%) | 7 (1%) |
Elizabeth line | 377 (97%) | 7 (2%) | 2 (1%) |
Chiltern | 133 (95%) | 7 (5%) | 0 (0%) |
Merseyrail | 253 (94%) | 10 (4%) | 5 (2%) |
Transport for Wales | 412 (94%) | 18 (4%) | 4 (1%) |
London Overground | 961 (92%) | 49 (5%) | 30 (3%) |
Southeastern | 608 (92%) | 42 (6%) | 7 (1%) |
Govia Thameslink Railway | 1064 (91%) | 74 (6%) | 26 (2%) |
East Midlands Railway | 199 (90%) | 20 (9%) | 2 (1%) |
TransPennine Trains | 245 (89%) | 16 (6%) | 14 (5%) |
South Western Railway | 646 (87%) | 66 (9%) | 24 (3%) |
West Midlands Trains | 394 (84%) | 46 (10%) | 28 (6%) |
ScotRail | 705 (81%) | 87 (10%) | 75 (9%) |
Northern Trains | 718 (81%) | 69 (8%) | 94 (11%) |
Great Western Railway | 586 (78%) | 71 (10%) | 86 (12%) |
Avanti West Coast | 56 (75%) | 10 (14%) | 8 (11%) |
London North Eastern Railway | 53 (73%) | 8 (11%) | 11 (15%) |
CrossCountry | 114 (69%) | 12 (7%) | 39 (24%) |
Open Access Operator summary
Operator name | Within PPM | Late | Very late or cancelled |
---|---|---|---|
Heathrow Express | 66 (83%) | 13 (16%) | 0 (0%) |
Hull Trains | 2 (66%) | 1 (33%) | 0 (0%) |
Grand Central | 2 (50%) | 1 (25%) | 1 (25%) |
Lumo | 1 (33%) | 1 (33%) | 1 (33%) |