Bertie TrainsBertie Trains

PPM for Tuesday 23 December

Key info

Public Performance Measure (PPM) is the older measure of train operator performance. PPM is based only on delay at destination and the train must have called at all planned stops.


Source: Network Rail

Data quality: Low – Data source does not adjust for calling pattern changes and some smaller methodology differences

Last updated: 23 December 2025 at 13:24

National summary

Within PPM: 7911 (89%)

Late: 584 (7%)

Very late or cancelled: 349 (4%)

Total: 8844

Train Operating Company (TOC) summary

Operator nameWithin PPMLateVery late or cancelled
Caledonian Sleeper Limited3 (100%)0 (0%)0 (0%)
Elizabeth line445 (99%)1 (0%)0 (0%)
c2c159 (98%)3 (2%)0 (0%)
London Overground616 (96%)11 (2%)12 (2%)
Merseyrail247 (96%)5 (2%)3 (1%)
Chiltern138 (95%)6 (4%)1 (1%)
Southeastern515 (92%)37 (7%)4 (1%)
Transport for Wales401 (91%)25 (6%)14 (3%)
Greater Anglia469 (91%)31 (6%)13 (3%)
ScotRail829 (91%)62 (7%)15 (2%)
Govia Thameslink Railway1107 (90%)85 (7%)36 (3%)
East Midlands Railway179 (90%)8 (4%)10 (5%)
South Western Railway592 (88%)48 (7%)29 (4%)
Great Western Railway595 (87%)59 (9%)28 (4%)
West Midlands Trains404 (85%)37 (8%)31 (7%)
TransPennine Trains129 (82%)8 (5%)20 (13%)
London North Eastern Railway60 (82%)6 (8%)7 (10%)
Northern Trains881 (81%)116 (11%)85 (8%)
Avanti West Coast76 (69%)30 (28%)3 (3%)
CrossCountry66 (60%)6 (5%)38 (35%)

Open Access Operator summary

Operator nameWithin PPMLateVery late or cancelled
Heathrow Express66 (100%)0 (0%)0 (0%)
Hull Trains5 (100%)0 (0%)0 (0%)
Lumo3 (75%)1 (25%)0 (0%)
Grand Central3 (60%)2 (40%)0 (0%)