PPM for Tuesday 06 October
Key info
Public Performance Measure (PPM) is the older measure of train operator performance. PPM is based only on delay at destination and the train must have called at all planned stops.
Source: Network Rail
Data quality: Low – Data source does not adjust for calling pattern changes and some smaller methodology differences
Last updated: 6 October 2026 at 15:29
National summary
Within PPM: 10259 (87%)
Late: 1062 (9%)
Very late or cancelled: 457 (4%)
Total: 11778
Train Operating Company (TOC) summary
| Operator name | Within PPM | Late | Very late or cancelled |
|---|---|---|---|
| Caledonian Sleeper Limited | 3 (100%) | 0 (0%) | 0 (0%) |
| London Overground | 807 (97%) | 8 (1%) | 9 (1%) |
| Merseyrail | 319 (94%) | 7 (2%) | 11 (3%) |
| ScotRail | 1092 (93%) | 51 (4%) | 25 (2%) |
| Greater Anglia | 634 (93%) | 36 (5%) | 5 (1%) |
| Transport for Wales | 504 (91%) | 33 (6%) | 16 (3%) |
| London North Eastern Railway | 86 (91%) | 7 (7%) | 1 (1%) |
| c2c | 180 (91%) | 14 (7%) | 2 (1%) |
| TransPennine Trains | 136 (87%) | 17 (11%) | 2 (1%) |
| Northern Trains | 1215 (86%) | 154 (11%) | 38 (3%) |
| Greater Thameslink Railway | 1541 (86%) | 170 (10%) | 63 (4%) |
| South Western Railway | 734 (85%) | 94 (11%) | 29 (3%) |
| CrossCountry | 114 (85%) | 12 (9%) | 7 (5%) |
| Southeastern | 769 (83%) | 128 (14%) | 25 (3%) |
| Great Western Railway | 737 (82%) | 98 (11%) | 58 (6%) |
| West Midlands Trains | 553 (81%) | 91 (13%) | 35 (5%) |
| Avanti West Coast | 126 (81%) | 21 (14%) | 7 (5%) |
| Chiltern | 143 (79%) | 35 (20%) | 1 (1%) |
| East Midlands Railway | 197 (77%) | 44 (17%) | 12 (5%) |
| Elizabeth line | 369 (70%) | 42 (8%) | 111 (21%) |
Open Access Operator summary
| Operator name | Within PPM | Late | Very late or cancelled |
|---|---|---|---|
| Lumo East Coast | 4 (100%) | 0 (0%) | 0 (0%) |
| Heathrow Express | 78 (95%) | 4 (5%) | 0 (0%) |
| Lumo West Coast | 3 (75%) | 1 (25%) | 0 (0%) |
| Grand Central | 6 (66%) | 3 (33%) | 0 (0%) |
| Hull Trains | 5 (62%) | 3 (38%) | 0 (0%) |